Skip to content

SpaceX Wants 456 Starship Launches a Year From Starbase. The FAA Just Started Reviewing It

The FAA opened a big environmental review of SpaceX's plan to go from 25 Starship launches a year at Starbase to as many as 456, plus 912 landings.

Devon Dooley / So Basically

So basically: SpaceX is asking to fly Starship from Starbase, Texas almost like a regular airline schedule. The FAA said Tuesday it will prepare a full environmental study of a plan for up to 456 launches and 912 landings a year. Right now Starbase is capped at 25 launches and 50 landings.

The ask in plain numbers

Today’s ceiling: 25 Starship launches a year from Boca Chica.

What SpaceX wants eventually: 456 launches a year. That is about 18 times the current cap.

Landings would jump from 50 a year to 912. That covers both Starship and the Super Heavy booster, and they could come down at the pad, in the Gulf, or out in the open ocean.

Starbase has only flown three times this year so far. Flight 14 on Sept. 28 was the first one to reach orbit and drop Starlink satellites. Bloomberg has noted Starbase has never launched more than five times in a single year. So 456 is not “next month.” It is a ceiling SpaceX wants on the books for when the rocket is ready to hammer cadence.

Two phases, not one big switch flip

The FAA says the proposal comes in stages.

Phase 1: up to 100 launches and 200 landings a year. Any day. Any hour.

Phase 2: up to 456 launches and 912 landings a year. Still any hour, but only Monday through Friday.

Phase 1 alone in Texas would already be bigger than the 44 Starship launches a year the FAA approved for Florida’s Launch Complex 39A earlier this year.

This is paperwork, not a green light

Important: the FAA did not approve 456 launches. It opened a Programmatic Environmental Impact Statement, or PEIS. That is the long review where they study air quality, wildlife, coastal stuff, noise, water, historic sites, and how often jets have to dodge rocket corridors.

Public comments are due Nov. 30, 2026 on regulations.gov under docket FAA-2026-12808. There are in-person meetings Nov. 17 in Brownsville and Nov. 19 in Port Isabel, plus a virtual one Nov. 18.

A draft PEIS comes later. Nobody has said when. Until this finishes, Starbase still runs under the existing 25-launch limit. That includes Flight 15, which Elon Musk recently said is hopefully about four to six weeks out and may try to catch the ship with the tower.

Why the number feels wild

Musk has talked about Starship eventually flying more than once an hour. 456 launches a year is roughly one to two a weekday if you use every slot. That is how you build a Moon and Mars logistics system, not a “cool test rocket we fly a few times a year.”

It is also how you stress every neighbor, bird sanctuary, and airline route around South Texas. That is exactly why the FAA is doing a full PEIS instead of a lighter review.

What to watch next

  • Does Phase 1 (100 a year) move faster than the full 456 ask?
  • How loud the local pushback gets at those November meetings
  • Whether Flight 15 actually catches the ship, because cadence without reuse is just expensive fireworks

My take

456 sounds insane until you remember what SpaceX is trying to build. If Starship is real transport, not a demo, you need a license that looks like a busy airport, not a science fair.

I still want the review to be real. South Texas should not get steamrolled for somebody’s Mars slideshow. But the direction is clear: SpaceX is done pretending Starbase is a quiet test site. They are asking for factory-rate flight. The only question left is how much of that number the FAA will actually give them.

So basically — pass it on.

Daily Updates

Get new stories in your inbox

Near-future tech when it moves. Robots, space, EVs, AI. No spam.